Aqua Pro 69717 9 1/2″ Long Lead Free Magnesium Anode Rod with 3/4″ Male Pipe Thread (6)

Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread (6)

Aqua Pro 69717 9 1/2" Long Lead Free Magnesium Anode Rod with 3/4" Male Pipe Thread (6) Rating:
List Price: $49.09
Sale Price: $49.09
Availability: Usually ships in 1-2 business days

Product Description

Water Heater Anode Rod; For Suburban And Morflo Water Heaters; 9-1/2 Inch Length; Magnesium; With 3/4 Inch Male Pipe Thread Drain Plug; Without Retail Packaging; Lead Free

Details

  • Compatibility: Suburban And Morflo Water Heaters
  • Length (IN): 9-1/2 Inch
  • Thread Size: 3/4 Inch Male Threads
  • Material: Magnesium
  • 18 Percent More Magnesium For Extended Protection